上海办公室装修公司

切换到新站
 
 
  • 公司概况Company profile
朗艺简介Langyi introduction 经营宗旨Business purpose 经营理念Business philosophy 设计理念Design concept
质量管理Quality management
价格管理Price management 服务管理Service management
 
朗艺首页 公司概况 质量管理

  质量问题一直是装修业主们最关心的问题,也是装饰工程中时常遇到的问题。朗艺将施工人员分为基础、水电、泥工、木工、油漆等专业工种,按工程施工需要进行专业流水作业;在施工管理方面,总结了一般公司所采用的监理制的优缺点,实行设计人员和项目经理现场监督管理的双重质量保证体系。
  工程分项验收制度是技术部另一项重要制度,该制度对隐蔽工程、水电工程、防水工程、工程竣工及其他各项验收都有详细、明确的规定,如验收时间、验收时需到场人员、验收结果的生效、验收记录报表的存档等等。按照验收制度,设计技术人员或质检人员在现场发现的任何质量问题或质量隐患都必须当场立即指出,并限时整改。在朗艺质检人员心目中,质量问题没有大小之分,只有是非之分,只有把握住每一个细节才能做出优良的工程,也才能让朗艺的每一位客户真正的满意放心!
  朗艺对各专业工长和工人坚持定期专业培训也是朗艺在工程质量方面取得成功的因素之一。朗艺的培训分专项培训和统一培训。专项培训是针对某一专业工种的培训,质检人员将检查工作中发现的某一工种常出现和较易出现的问题单独归为一类,对某一工种的所有工长进行专项培训,以实现从根本上逐步解决该工种易出现的问题。统一培训涉及的内容较多,如各工种之间的配合问题等等。整个工程需要多工种的配合才能达到完美的效果。


  Quality problem has been the most concerned issue of decoration owners, but also the common problems in the decoration engineering. Construction personnel are divided into basic, hydropower, mason, carpentry, paint and other professional workers by Longyi, according to the construction needs to product a professional line work; in construction management, summarize the advantages and disadvantages of the supervision system adopted by general company, implement double quality assurance system of the design personnel and project manager on-site supervision and management.

  Engineering Technology Department acceptance system is another important system, the system has a detailed and specific provision of the hidden projects, the hydropower projects, the waterproofing projects, the project completion and the other acceptances, such as the acceptance time, the scene officers when acceptance, and force of acceptance results, the archive of acceptance record report etc.. According to the acceptance rules, the design technical personnel and quality inspection personnel at the scene found any quality problem must immediately point out on the spot, and rectification in limit time. In the mind of Langyi quality inspection personnel, quality problem is regardless of size of the quality problem, but to see right or wrong. Only grasping every detail can make excellent project, also can every customer truly satisfied with the rest assured in Langyi!

  The regular professional training of various professional foreman and workers is one of the success elements of Langyi in the projects quality. The training of Langyi is divided into special training and unified training. The special training is a training for a professional job, and in inspection work, quality inspection personnel will separate the problems often appearing and prone to appearing in a job into a category, for a special training to all foreman of the job, in order to achieve a fundamental step by step to solve the types of problems. Unified training involves many contents, such as various types of cooperate problem between the jobs and so on. The project need more types of cooperates in order to achieve the perfect results.
 

在线咨询
免费量房
免费设计
索要报价
扫一扫

扫一扫

预约有惊喜
签约送大礼

返回顶部